top of page
indonesia-B3lQyvnV.jpg

COUNTRIES /

SYRIA

Syria

Reconstruction 2035

Rebuilding a nation — a decade faster

THE VISION

After more than a decade of conflict, Syria faces the immense challenge of rebuilding its physical infrastructure. The urban destruction is among the most severe in modern history.

An estimated $400 billion is required in reconstruction investment to restore essential services, enable refugee return, and rebuild critical national systems. Based on post-war Iraq and Lebanon, around $260 billion of that will need to be spent on grey infrastructure.

Conventional construction with steel rebar is slow — cutting, bending and welding on-site, plus epoxy coatings or cathodic protection. With damaged roads and limited heavy transport, Syria's reconstruction would take 20–25 years using conventional materials.

Scandinavian Construction Solutions proposes BasBars™ as a primary reinforcement system. Its lightness, speed of installation and corrosion immunity could reduce Syria's reconstruction timeline by as much as 10 years — and save tens of billions of dollars.

$400B

TOTAL RECONSTRUCTION REQUIRED

10 yrs

TIME SAVED WITH BASBARS™

3.5M

NEW HOUSING UNITS NEEDED

$30B

BASBARS™ MARKET OPPORTUNITY

WHERE BASBARS™ FITS

Built for Syria's most demanding infrastructure.

01

application

Mass Housing

3.5 million homes — built faster and lighter to enable refugee return and economic reintegration.

02

application

Hospitals

Non-conductive and non-magnetic — the optimal choice for medical infrastructure.

03

application

Roadways & Bridges

Thousands of kilometers of roads and bridges with double the lifespan and 40% less CO₂.

04

application

Latakia & Tartus Ports

Marine-grade installations on the Mediterranean — engineered for permanent saline exposure.

05

application

Airports & Railways

Faster reconstruction with steel-free concrete protecting instruments and signals.

06

application

Earthquake Resilience

After Aleppo 2023, lighter buildings save lives — BasBars™ cuts structural weight by half.

,,

The faster and more cost-effective Syria's reconstruction can be achieved, the better. BasBars™ is the way to rebuild stronger, faster and smarter.

SCANDINAVIAN CONSTRUCTION SOLUTIONS

CONTINUE

Other markets

nepal-IG-_yXwJ.jpg

India

VIKSIT BHARAT 2047

nepal-IG-_yXwJ.jpg

Nepal

HYDROPOWER NATION

indonesia-B3lQyvnV.jpg

Indonesia

GOLDEN INDONESIA 2045

bottom of page